Prefabricated Industrial H Section Steel Structure Material Frame Building Warehouse

Prefabricated Industrial H Section Steel Structure Material Frame Building WarehousePrefabricated building is made by steel structure frame, sandwich panel/color steel sheet roof and wall, aluminium window, door, bolt, etc., which are more and more popular in mordern society. Offer requestType of Building  Please state type of building, ie: workshop, warehouse, hall, hangar, farm, roof structure or other constructionDimensiona(width)b(length)h1(wall height)h2(total height)    Construction Site Roofing and Walls(1) sandwich panel    (2) profile steel sheets     (3) steel sheet+glasswool blanket       (4) no walls-only roof with structuresMax. wind speed& snow load Contact Name Company Name Phone Number Email Additional info Send us sketches, drawings or the project, if you haveLight steel structure building is a new type of building structure system, which is formed by the main steel framework such as H-section, Z-section, U-section steel components, roof and walls (a variety of panels) and other components such as windows and doors. Light steel structure building is widely used in warehouses, workshops, large factories, and so on.  Compared with the traditional concrete structure building system, the light steel structure projects have a series of advantages, such as large span, low demands of base structure, strong seismic and wind resistance, beautiful appearance, shorter construction cycle, strong corrosion resistance, non-polluted, low maintenance costs and so on. Therefore it is more and more popular with the customers. It is mainly used for large-span structures, workshops, warehouses, office buildings, large supermarkets, logistics warehouses, showrooms, hangar, etc.Because of the diversification of steel structure material and the flexible design, the light steel structure projects can better meet customers' demands for space structures, and reasonable economy.   1. D&D project We undertook the design, production, construction and installation Qingdao D&D project by ourselves, The total area is about 40000 and this project which has a special shape(such as foyer, shaped lighting plate)required to complete 12000 within 100days , it also inspected works,various efforts of the corporation,and eventually all be finished as requested by Party and passed the quality inspection department of the test.  2. Korea steel Korea steel company is Korea-owned and located in Qingdao Economic Development Zone , the first phrase and the third phrase are total 18000. 3. Mauritius project  This is a country landscape project and our company vested huge energy and purchased special; equipment, produced carefully up to every bolt and installed some times before export in factory. What we did got good reputation from users and gave us another order.4. Uzbekistan Logistics warehouse Uzbekistan Logistics warehouse has four logistic warehouses and total area is 40000 sq.m .We had not got any complaints about quality from the beginning to the end. Our CEO and our manager took a return visit to them because we can not be blind optimism , should visit them drivingly to find what should we do more for them5. Gabon warehouse   Main steel frame of this warehouse is L type, 33m x 20m x 6m, request high technology and our company sent Mr.Li staffs to guide in site. 6. Argentine plant  Argentina plant is built in 2010 which is 84m x 64m with attached span, total area is 5930 sq.m and has been used now, this customer signed another contract with us ,wanted to build a new plant whose area is 7030 sq.m Characteristics: 1. Wide span: single span or multiple spans, the max span is 36m without middle column.2. Great cost: Unit price range from USD35/m2 to USD100/m2 according to customer's request.3. Fast construction and easy installation.4. Long using life: up to 50 years.5. Others: environmental protection, stable structure, earthquake resistance, water proofing, and energy conserving. Materials: 1. The main frame (columns and beams) is made of welded steel or hot-rolled H-steel .2. The columns are connected with the foundation by pre-embedding anchor bolt.3. The beams and columns, beams and beams are connected with high-strength bolts.4. The roof and wall steel part is made of cold form C or Z purlins.5. The wall and roof are made of color steel sheet or sandwich panels, which are connected with the purlin by self-tapping screw.6. Doors: sliding or rolling door; 7. Window: PVC or aluminium window;.  ----------------------------------------------------------------------------------------------------------------------------------------Peru Hydropower station with 50 tons craneTotal steel works amount more than USD 5 millionThis project wars erected in 2013 with 60 days construction period in total. the hydropower station has boosted the devolopment of local economy and solved the energy shortage issue.Qingdao KXD Steel Structure Co.,Ltd has been an industry leader for prefabricated steel building with preeminence in custom designs and fab