Product Description Turning Parks Into Power Centers:
Revolutionizing Fitness with Outdoor Gym Equipment and Park
Exercise EquipmentNameChest
PressModelGYX-A01Size2060*680*1950mmColorGreen, grey,
bule,brownStandardTUV or NSCCDelivery TimeFor one 20GP 18-25 days,
for one 40GP 20-25 days.Life Time5-8 years with
good maintenanceWarranty1
year Free warranty and lifetime maintenanceDuring the year, owing to natural damage,
which
appear in the using process and is not maliciously man-made
destruction. Our company will provide the corresponding components free of charge; Beyond one year, for replaced parts, components need to charge at cost.Noted: All the fees of freight are in buyer's account.PaymentT/T,
30% deposit before production, and 70% balance before
shipmentInstall Method1)Buried Installation Method 2)
Expand screw fixed installation method , covered with concrete and
the thickness is more than 20cmUsagePark, School,
Garden,Backyard,Residential area and some other public
placeFunction Description:1) Designed to exercise every part of the
body2) Improves your balance, strength and flexibility3)
Strengthens your heart, lungs, waist and breath4) Suitable for
middle age and old adults Seated Chest PressThis
strength-building piece of equipment allows two users to perform
chest presses at the same time. The unique design of theSeated
Chest Press means that once seated, the user creates their own
resistance via their body weight. This provides a strenuousworkout
for the chest, shoulder and arm muscles.This equipment:1. Builds
strength in the arms, chest and back2. Improves balance and
flexibility3. Suitable for all abilities4. 1 or 2 Users at once5.
Suitable from 11 years +Body BenefitsThe Seated Chest Press
provides an excellent strength-building workout.Primary Muscle
Groups√ Chest√ Shoulders√ Back√ ArmsSecondary Muscle Groups√
Core Installation Method1.1Note: This equipment is assembled
already and only need to fix the equipment on the installation site
in accordance with the following requirements.1.2 Site
requirements: venue is required to stay away from EN 1176
playground or similar device, the top and surrounding must not have
hazardous materials such as wire and so on through; basic ground
should be higher than the other road or plane, in order to prevent
flooding, sand soaked buried; underground less than 2m can not have
a variety of pipeline facilities and communication lines. Keep away
from flammable, explosive and toxic and hazardous items. Horizontal
distance is away from all kinds of office buildings, residential
and various Church House tubes should not less than 5m; venue
should be fully hardened to prevent breakage, deformation sinking,
and flat should be appropriate.1.3, The construction method: Before
construction, should survey surface and underground: Geological
structure in the depth of less than 800mm should be Class II
ordinary hard soil non-porous and non-sandy loam type of geological
structure which tightened coefficient (f) is not less than 0.7.
Otherwise, the soil should be treated equivalent. Be careful not to
damage titles from floor, in order to recover and use after
finished pouring embedded part. A> Devices collision zone
minimum size is 2200X800 (mm), a least 5200mm * 3800mm 300mm deep
bunker is required to dug around the area of the instrument
collisions (including collision zone).B> To dig a crypt in
accordance with the requirements and size (500 * 500 * 550mm) of
the drawing;C> Pouring 100mm deep concrete into the crypt
bottom, then use the four homemade mold M16 embedded parts into
which (pitch dimensions at right), use a ratio of 1:2:3.5 concrete
(cement grade should not be less than NO.325) to cast, then smooth.
Observe the verticality between ground and emended part and ensure
their safety, robustness. The embedded parts above ground should be
between 55-60 mm. After pouring, when the concrete surface is
hardened then removed molds for timely recovery and keeping the
original ground level is required (use concrete make original floor
flat). After work finished in 24 hours and let people take care, to
prevent others from using the touch. D> After the
concrete, make equipment and embedded parts connected,use 8pieces
M16 nuts and 8 pieces M16 flat washers fastening respectively
(installation method as above picture showing). After installation,
firstly check the verticality between equipment and installation
ground, requiring vertical tolerance is less than 1/100. Then
fasten all bolts and nuts, check the rotating parts are flexible or
not, if not, adjust immediately .After everything is ok, fit the
hood with M8 * 25 hex screws Technical SpecificationsThis
equipment conforms to the required standard for safety and quality
as per DIN79000 and EN16630 : 2015This equipment is mainly made of
galvanized pipe then zinc power coated at last plastic power
coatedThe center pipe diameter is 140mm and thickness is
3.00mmCoating : zinc layer + plastic powderBase plate is made of st
Related products about Turning Parks Into Power Centers Revolutionizing Fitness with Outdoor Gym Equipment and Park Exercise Equipment
-
Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
-
Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
-
Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
-
Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
-
G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
-
New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
-
China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
-
Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup