Textile Machinery /Stenter Machine / Textile Finishing Machine

Introduction  The Stenter Machine is used for cotton, chemical fiber and blended knitted and woven fabric open width padding auxiliaries, drying and styling process. According to the width of the fabric, we can offer the following models: FSLD-1600/1800/2000/2200/2400/2600/2800/3000/3200/3400/3600/3800/4000  The machine is equipped with horizontal rollers, the diameter is from 360mm to 400mm based on the machine width of 3000mm or wider.  Functions of Stenter MachinesHeat setting is done by the stenter for lycra fabric, synthetic and blended fabric.Width of the fabric is controlled by the stenter.Finishing chemical apply on fabric by the stenter.Loop of the knit fabric is controlled.Moisture of the fabric is controlled by the stenter.Spirility controlled by the stenter.GSM of the fabric is controlled by stenter.Fabric is dried by the stentering process.Shrinkage property of the fabric is controlled.Curing treatment for resin, water repellent fabric is done by the stenter.OriginChinaMain Matching Fabric open width fabric (70~350g/m²) madeof cotton, cotton/polyester,wool,synthtic fiber and other blended fibersHeat sourcenatural gas/circulating conduction oil/steamStentering typehot air circulatingHolding typepin+clipChain typepitch 60mm,oil-free lubricatedRail typecarbon steel+polymer wearing stripWorking typehorizontal return chain Working width1000-3600mmWorking speed5-60m/minChamber Nos2-12Chamber width3000mmInsulating board thickness150mmTemperature of chamber100~220ºCPinning & brush overfeed ratio-20%~40%Temp.& Breadth adjustment typeseparately adjust on each chamberCapacity of machine61.5kw+22.75kw*chamber*NosStandard machine power supply380V/3P/50HZControl power supply220V/24VSteam specification of steam box3-6kg/cm²Steam comsuption of steam box100-150kg/hCompressed air 0.35-0.6MPaTotal weight14T+5.8T/chamber*Nos  Payment TermsPayment Conditions:  30% down payment by T/T and the balance payment should be T/T or in irrevocable L/C at sight. Delivery time:90 days from the date of receiving down payment. All payment should be received before delivery in China.  Any questions and requirments,contact us now!        /* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1