rubber open milling machine/rubber mixer machineQingdao Create
Trust Industry Co., Ltd.make high quality rubber machine, from
materials to producing, we use the good quality material,
complete management system, also excellent aftersale
service, we hope to be one reliable factory for you!Name:
Rubber Mixing Mill, Rubber Mill, Two Roll Mill, Rubber Mixing
Mill, Two Roll Rubber Mixing Mill, Lab Rubber Mixing
Mill.Application: The mill is used for rubber plasticating,
mixing, warming and sheeting.General Design: 1. The mill
consists mainly for rolls, frame, bearing, roll nip adjusting,
screw, heating and cooling device, emergency stop, lubrication
system and such sections as electrical controls and, etc.2. The
main electric motor arrives the front and rear rolls to rotate
oppositely through reduar, driving geras and friction
gears.Equipment advantages: Rolls: Alloy chilled
cast iron rolls with surface hardness 510 ~ 550 BHN. The Rolls
are mirror finished & polished, duly grinded and are hollowed for
cooling or heating. Bearing: the Swedish imports, load
bearing force big, can adjust the gap, high precision, good
rigidity Roll Clearance Adjusting Unit : Through worm
and worm gear drive clutch rod for parallel sheeting hand wheels to
close theNIP from One point only. Roll Cooling :
Universal rotary joints with inner spray pipes with hoses and
headers. Piping is complete up to supply pipe
terminal. Journal Bearing Housing : Heavy duty steel
casting housing fitted with antifriction roller
bearings. Lubrication : Manual / motorized grease
lubrication pump for anti friction roller bearings fitted in dust
sealed housing. Stand Frame & Apron (Cap) : Heavy
duty steel casting. Gearbox : Helical reduction gearbox
greaves/ shanti make direct coupled with rear roll and
motor. Base Frame : Common base frame heavy duty,
steel beams and MS plate fabricated accurately machined on which
whole machine with gearbox and motor are fitted. No deep
foundation required. Electric Control Panel : Star
delta electric operating panel with auto reversing, voltmeter,
ampere, overload protection relay,3 phase indicator and emergency
stop switch.Technical
parameter:ModeXK-160XK-230XK-250XK-300XK-360XK-400XK-450XK-560XK-550BXK-660working
diametetr of rolls(mm)160230250300360400450560/510550660working
length of rolls(mm)32060062075090010001200153015002130front roll
surface
speed(m/min)8.9510.2114.115.116.2518.6524.2627.7227.9428.6Rfiction
ratio1: 1.351: 1.191: 1.171: 1.251: 1.251: 1.271: 1.271: 1.21:
1.221: 1.24Max. nip(mm)4.57810101015151515Capacity per
batch(kg)1-26-108~1515~2020~2518-3525-5035~5050~60165Motor
power(kw)5.51518.52230375590110245Dimensions:L × W × H(mm)1380×
860× 13202800× 1200× 11203400× 1500× 15003400× 1500× 15503780×
1850× 17504350× 1850× 17855200× 2380× 18405845× 2284× 19785870×
2475× 20457465× 3662× 2080KeywordRubber Mixing Mill, Rubber Mixer,
Rubber Machine, Rubber Mixing MachineFQA-Problems of customer
concern:About machine performance
quality1. Q: How to
guarantee the quality of outsourcing parts?
A: First choice more than 4 suppler by
tender, There are strict system and process for inspecting
outsourcing parts. And there are outsourcing inspectors, after
inspection, qualified goods, labeling and storage. Not qualified,
return.2. Q: Which
brand of electric part?
A: Use world famous brands, Siemens, Omron,
Toshiba, Schneider, ABB Customer can specify the
brand.3. Q: Which
PLC: A: Siemens,
Omron,
Mitsubishi4. Q: How
to control the quality?
A: There are inspectors for inspecting equipment quality
and performance, after a ssembly, machine run continuously for at
least 12 hours at one time, Total running time should be not less
than 48 hours.About
installation1. Q: When
the guide engineer arrive at customer's factory?
A: If need installation on
site, engineer will arrive at factory within one week after machine
arrived at factory.About after-sales
service1. Q: What
is the warranty time? A:
5 years after machine arrived at
factory2. Q: How
to solve the problem?
A: Within half an hour after getting customer' problem,
inform the solution way, there are three ways for different
conditions. 1, Which can be solved by phone or Email, it will be
solved in two hours. 2. Which can be solved by Remote Control, it
will be solved within four hours(machine is equipped by Remote
Network Control Problem). 3. Which need solve it on site, engineer
arrive at factory within one week(in the two years warranty date,
engineer has the visa any time of the country where the machine./*
March 10, 2023 17:59:20 */!function(){function s(e,r){var
a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Rubber Open Milling Machine/Rubber Mixer Machine
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup