API 7K F-500 Triplex Mud Pump for Drilling Rig for Sale

API 7K F-500 Triplex Mud Pump for Drilling Rig for saleProduct DescriptionWe specialize in the field of well drilling. We supply Drilling & workover rig, triplex mud pump(F& 3NB series), solid control system and their parts; Drilling & Workover engineering services with high quality and competitive price.Triplex mud pumps and triplex mud pump parts are already our featured products ever since start of our business. We supply quality Emsco F-series mud pumps including F-500, F-800, F-1000, F-1300, F-1600, RLF-2200, and China National 3NB series mud pump, including 3NB350, 3NB500, 3NB-600, 3NB800, 3NB1000A/D, 3NB1300A/D, 3NB1600. The full range of products can well satisfy any need from the clients. F-series Triplex Mud Pump1. Be easy to repair and maintain internationally:Our RLF series mud pump are designed and manufactured on the basis of American Emsco F series mud pump strictly according to American Petroleum Institution API 7K Standard. All of its expendable parts are interchangeable with any other spare parts produced according to API standard. 2. Long service life:a) Fluid end: longer stroke, lower pumping speed, best suction performance and water supplying performance,  electric spray pumpb) Power end: combined lubricating system of forced lubrication and splash lubrication3. Out-standing operation performance:solid and compact structure, small volume, be applicable to the requirement of high pump pressure and high displacement4. F-500 mainly suit to rig 15-20, F-800 mainly suit to rig 20-32, F-1000 mainly suit to rig 20-32, F-1300 mainly suit to rig 32-45, F-1600 mainly suit to rig 50-90, F-2200 mainly suit to rig 50-90 Detailed PhotosFAQQ: How can I place order?A:You can contact us by email  about your order details, or place order on lineQ: How can l pay you?A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,Western Union are the most usual ways we are usingQ: What's the order procedure?A: First we discuss order details, production details by email or TM. Then we issue you anPl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.Q:How do you take care when your clients received defective products?A:replacement. If there are some defective items, we usually credit to our customeror replace in next shipment.Q: How do you check all the goods in the production line?A:We have spot inspection and finished product inspection.We check the goods when they go into next step production procedure./* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1