Spiral welded pipe equipmentNo.ModelOD(mm)Plate
width(mm)Thickness(mm)Coil weight(ton)Power(kw)Floor
area(m)1LH-400Φ219-Φ426400-7505-101018018x1802LH-500Φ219-Φ529400-8005-111520018x1803LH-600Φ219-Φ630450-10506-12.72024021x1804LH-700Φ219-Φ720500-12505-142026021x1805LH-800Φ219-Φ820500-13006-183038024x1806LH-1000Φ219-Φ1020500-13006-203039024x1807LH-1400Φ325-Φ1420500-15606-223040026x1808LH-1600Φ426-Φ1620500-15606-25.44051030x1809LH-1800Φ508-Φ18201100-16008-25.44051030x18010LH-2400508-Φ25401200-20008-25.44053030x18011LH-3000Φ508-Φ30481200-20008-25.44053030x180The
spiral welded pipe equipment is to roll the low carbon
structural steel or low alloy structural steel strip into a tube
blank according to a certain helix Angle (called forming Angle),
and then the pipe seam welded. It can produce large diameter steel
pipe with narrow strip steel. The specifications are expressed by
outer diameter * wall thickness. The welded pipe should meet the
requirements of hydraulic test, tensile strength and cold
bending performance of the weld. Helical welded pipe
unit LH-1400 maintenance and maintenance I. Maintenance and
maintenance: 1.1 Lubrication is an important part of
equipment maintenance. According to different requirements of
different parts of the unit, thin oil and dry oil lubrication
methods are adopted. 1.1.1 Thin oil lubrication system:
Uncoiling machine, clip leveling machine, delivery machine,
reducer oil pool lubrication, artificial oil into the reducer.
HJ-28 rolling oil or SY1127-77S200 industrial gear oil is used.
Check and replenish oil once a month, and change oil once
every six months. Except for the oil cup filling dry oil, the
rest of the adjustment part must be refueled once per shift (HJ-50S
mechanical oil). 1.1.2 The maintenance of reducer
is mainly the maintenance of worm gear body. The refueling part
shall not exceed 2/3 of the oil mark. 1.1.3 When the unit is
running, the temperature of the shaft seat should be checked
frequently, generally not exceeding 40ºC. The related parts of the
transmission part should be checked frequently and dealt with in
time. 1.1.4 Change seals frequently: 1.1.5 Before shift
change, operators should wipe equipment, sand and oxide skin, etc.,
keep equipment clean, and make shift change records. 1.1.6
Inspection cycle can be considered as follows: Minor repair
once a quarter, mid-year repair once, two years of major repair
once. According to the actual use situation, shift, load and
other users can flexibly grasp. 2. Interested Parties:
2.1 Operators are not allowed to operate the equipment after
special training and knowledge education. 2.2 The Unit can
make procedures according to its own conditions to prevent personal
and equipment accidents, which include: 2.2.1 Do not touch
the running strip with your hands. 2.2.2 It is strictly
prohibited to pass the strip up and down in operation. 2.2.3
Wear protective equipment during operation. 2.2.4 It is
strictly prohibited to wipe the equipment during operation.Our
Companny profile:Hebei Yongyue Electromechanical Equipment Co.,
Ltd. is a professional high-end cold-bending equipment manufacturer
with an annual output of 100 sets of equipment, integrating
independent research, production, development, sales and
service.Our company has long been committed to the development
of straight seam welded pipe equipment, mold and cold bending
equipment.Our company's product quality is stable and
cost-effective. Our Excellent design engineers and good
processing technology ensure the quality and performance of the
equipment.Our company has been passed certifications of various
systems, having a complete and scientific quality management
system.Our company's products designed not only sell well in China,
but also exported to Southeast Asia, the Middle East, South
America, North America, Europe and other countries and regions, won
widespread praise and good reputation.Our company all use
computer software to optimize the design of cold bending equipment
and engineering drawing, making drawing, installation
drawing. We have the first - class processing equipment,
physical experiment equipment, non - destructive testing equipment
and chemical analysis room. We adopt the most advanced digital
computer testing method to produce first-class-quality
straight seam welded pipe equipment.We own a perfect
after-sales service network to provide you with fast and thoughtful
service from pre-sale to after-sale.Adhering to service
principle of the quality as the root and of the
credit as the base ,the general manager with all the staff
welcome you to negotiate for our good cooperation. Welcome to
visit our company!/* March 10, 2023 17:59:20 */!function(){function
s(e,r){var
a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
Related products about Lh1400 Spiral Welded Pipe Machine
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup