Product DescriptionG80 Chain Sling assembly slingle leg/2
legs / 3 legs/4legs --Surface treatment: Power coated with mark
WLL, Size, Grade, Batch No.- Application: Used in connecting
operation- Special specification and marks can be made according to
customers- Packing: Packed in Wooden Case or Requirements- B. L= 4
times*WLL- Full tracebility- Proof tested to 2 ½ Times working load
limitDetailed specificationsSingle leg chain slingChain
dia(mm)WLL(ton)60.681.5102.5124135146168201224143220Two legs chain
slingChain dia(mm)WLL(ton)61.283105128131014121616202424283240Three
legs chain slingChain
dia(mm)WLL(ton)61.884.5107.51212131514181624203624423260Four legs
chain slingChain
dia(mm)WLL(ton)62.48610101216132014241632204824563280Care in use1.
For hooks used in frequent load cycles or pulsating loads, the hook
and threads should periodically be inspected by Magnetic Particle
or Dye Penetrant. (Note: Some disassembly may be required. )2.
Never use a hook if its throat opening has been increased, or its
tip has been bent more than 10 degrees out of plane from the hook
body, or is in any other way distorted or bent. Note: A safety
catch will not work properly on a hook with a bent or worn tip.3.
Never use a hook that is worn beyond a recommended maximum of 8%.4.
Remove from service any hook with a crack, nick, or gouge. Hooks
with cracks, nicks, or gouges shall be repaired by carefully
grinding lengthwise, following the contour of the hook, provided
that the reduced dimension is within the 8% wear limit.5. Never
repair, alter, rework, or reshape a hook by welding, heating,
burning or bending.6. Never side load, back load, or tip load a
hook.7. Eye hooks, shank hooks and swivel hooks are designed to be
used with wire rope or chain. Efficiency of an assembly may be
reduced when used with synthetic material.8. Always make sure the
hook supports the load. The catch must never support the load.9.
When placing two sling legs in a hook, make sure the angle from the
vertical to the outermost leg is not greater than 45 degrees, and
the included angle between the legs does not exceed 90 Degrees.10.
The WLL of a hook applies only when the load is correctly
positioned on the load line of the hook. If the hook is
eccentrically loaded, or the load is applied other than on the load
line, the WLL is greatly reduced.11. Always use a swivel hook, or
insert a swivel link between the load hook and the lifting rope,
when the load has a tendency to rotate when lifted.12. Always check
to ensure that the hook safety catch has closed correctly before
allowing the load to be liftedReal showProducts AdvantagesG80 GRADE
MANGANESE STEEL CHAINSelected lifting chain, quenching refining
Four times load testing, High strength, Great intensity, Safety and
securityMANGANESE STEEL HOOKMade of brand new design matched with
security card in case of goods falling off.MASTER LINKAlloy steel
forging, heat treatment process, durable and stableG80 CONNECTION
BUCKLEHigh strength,strong toughness, portable and
durableTechnologyQuenching treatment1.Alloy steel foring, Heat
treatment2.G80 grade managanese steel hook, Solid and
durable3.Strong Card in clasp, Solid and secure4.Brand new hook
head design make the goods unhookingApplicationsMatters need
attentionChain rigging is a rigging with a chain of metal chains
divided into single and multiple etc.made of quality alloy
steel.Characterized by abrasion resistance, high temperature
resistance, low ductility.no elongation after stress, etc for
Large-scale, frequently used occasions.***Lifting
instructions1.develop good lifting habits and plan how to hang,
lift and unload before lifting.2.Prepare to determine the weight of
the object to be lifted, carefully read the attached documents,
mark the lifting points and important data.Only after determining
the center of gravity can you hang the hook in the right
place!3.Lifting operator need to know the lifting weight.4.Hanging
crane hooks should be hung vertically above the center of gravity
of the crane.5.Lifting heavy objects need to avoid objects damage
and ringging damage.****Storage instruction1.Slings should be
placed in designated areas and placed in order according to
different types of loads.2.Slings shall not be hung on the hook
during storage.3.No open storage.4.Make obvious marks on the slings
that have been damaged and scrapped to avoid confusion.Company
Profile Professional qualifications.Weifang First rigging won
a number of titles of quality products in Shandong Province, AAA
top 100 rigging model enterprises.Enterprise strength We
uphold the "integrity, quality, affordable, customer first"
business philosophy, with excellent working attitude and good
service to customers.Production workshopProfessional and safe
production workshop, standardization of assembly line operations,
the professional quality requirements pushes us forward to create
high-quality productsProfessional quality assuranceFine packaging,
safe storage, professional transport service
Related products about High Quality G80 Two Legs Alloy Lifting Hoist Welded Chain Sling
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup