Combined Rice Milling Machine/ Complete Set Combined Rice Huller Price/Rice Polishing Machine

CTNM20 COMPLETE SET RICE MILLING EQUIPMENTStrong Pre-cleaning TypeDouble-layer Drum Cleaning, Destoning, Husking, Separating, Whitening, Grading by ONE-TIME operation1. Product Introduction CTNM20 Complete Set Combined Rice Mill combined with TZQY54 drum paddy cleaner and QSX45 de-stoner, 8'' rubber roller husker, gravity paddy separator, large volume inhale-air emery roller rice mill, rice grader, conveyors. Revolutionally equipped with drum type cleaning machine which engifted very strong cleaning efficiency, great brown rice separating and rice whitening performance, easy operation, convenient maintenance and high productivity, reducing the leftovers at the maximum level; with direct optional brown rice outlet, provides users with a flexible multifunctional rice milling solution. At the meantime, we reserved the possibility to match the follow up equipment such as multi-layer rice grader, rice polisher, color sorter etc, to improve the milling performance or extending its functions.1Feeding Hopper2Single Elevator3TZQY54 Drum Type Paddy Cleaner 4QSX45 Destoner5Double Elevator6MLGT20 8" Rubber Roller Husker7MGCZ70×6 Gravity Paddy Separator 815 Large Volume Inhale-air Emery Roller Rice Mill9Rice Grader10Electric Control Box2. Core competitivenessUnique DRUM TYPE Combined Paddy Cleaner and De-stoner♦ Independent structures for paddy cleaning and de-stoning, greatly improved the performance from traditional unibody design;♦ The double-layer drum type sieve mechanism with high cleaning efficiency;♦ Strong air-suction structured de-stoner, large air volume, excellent de-stoning efficiency;♦ Solid shock absorption bearing strengthened the main machine by high stablility, low vibration, low noise and less dust while working.High efficiency, low noise husker♦Double support mobile gearbox husker integrated reversing gearbox and mobile tightening device, efficiently avoided miscoordination between swinging gears.♦Over 90% de-hulling rate for one time operation.♦Durable rubber roller, convenient operation and calibration, high transmission efficiency, low noise and high stability.  Innovated inhale-air emery rice mill♦Emery rice mill equipped with a large diameter hollow spindle and innovative Emery roller whitening mechanism design.♦Strong inhale-air fan sucks in large volume air through milling chamber to reduce rice temperature thus bring down the broken rate, at the mean time bring away the brans to clean the rice and increase the gloss of whitened rice.♦Lower operation platform, more convenient operation and daily maintenance.  Stable gravity paddy separator♦Bigger screen with high separation speed and even paddy distribution.♦The horizontal and vertical angles of the screen are adjustable, suitable for all kinds of paddy, great screening and separating efficiency.♦Low left paddy for rehusking, reduce the broken rate efficiently.   4. Main configuration and technical parametersModel&Spec.CTNM20ACTNM20BCTNM20COutput(kg/h)800-1000800-1000800-1000Rice milling rate (%)68-72%68-72%68-72%Cleaner and de-stonerTZQY54/QSX45TZQY54/QSX45TZQY54/QSX45HuskerMLGT20MLGT20MLGT20Paddy separatorMGCZ70×6MGCZ70×6MGCZ70×6Rice millNF15A(1pc)NF15A(1pc)NF15A(1pc)Rice graderBasic rice graderMJP50×2MJP50×2Rice polisher//MPGT12.5Single elevatorDTG19/8-1pcDTG19/8-2pcsDTG19/8-3pcsDouble elevatorDTG19/8-8DTG19/8-8DTG19/8-8Power(kw)25.3226.6249.87Overall dimension(mm)3300×1200×34003800×1200×34005000×1200×3400  Pre-Sales Service:1. Inquiry and consulting support 2. Sample testing support 3. View our Factory After-Sales Service:1.pay the double air tickets, accommodation and food. Our technicists can help you in local place 2.According to the requirement of the buyer, our company sends engineers for installation and commissioning in buyer's site including the training of skills of buyer's workers on operation, maintenance, etc. 3.Supply the solutions for different farming environment. 4. For the damage caused by the users, our company provides the parts and accessories with cost price. 5. Our factory supplies the wearing parts with the cost price to clients. Package&Shipping:Products will be finished in 15-20 working days after payment. It depends on your order quantity. And the shipping time to the port is about 1-2 days   /* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1