Jiufu custom-made containers for industrial storage of gases Air
storage tanks Product Description I. Definition
Storage tanks are essential and important basic equipment in
petroleum, chemical industry, grain and oil, food, fire protection,
transportation, metallurgy, national defense and other industries.
Our economic life is always inseparable from large and small
anti-corrosion storage tanks, and the important role of
anti-corrosion storage tanks in national economic development is
irreplaceable. The gas storage tank is used to buffer
air, and also has the function of cooling (the outlet temperature
of the air compressor is about 70-80ºC), and the more important
function is to preliminarily remove water and oil. The gas storage
tank can remove 70% of oil and water, so it is an indispensable
equipment for the air compressor. II. Function
1.Air storage: There is no place to store compressed air in the air
compressor. The compressed air will be used up after it reaches a
predetermined pressure. Using the air storage tank, the finished
compressed air can be stored in the air storage tank to ensure more
stable use of air. 2.Pressure stability: the air
pressure is unstable and fluctuates greatly when the air compressor
is running. The gas storage tank can be used to control the air
pressure within an appropriate range and eliminate the fluctuation
of air flow in the pipeline. Through the gas storage tank, the
compressed air output by the air compressor will have a buffer
zone, which has a good source and can be kept at the set value. The
gas system can obtain a relatively stable pressure.
3.Cooling and filtering: the temperature of the finished
compressed air entering the gas storage tank will be reduced to
achieve the effect of cooling the compressed air initially. At the
same time, it can deposit some water and oil in compressed air to
improve the quality of compressed air
products.III.Fix1.Forward-facing method: First,
after the tank bottom is welded on the foundation, the ring plates
of the tank wall are assembled and welded on the tank bottom, and
then welded with the bottom plate, and then the second ring wall
plate and the ring wall plate are assembled one by one by
machinery, and the longitudinal weld of the second ring wall plate
is welded, and the circumferential weld of the second ring wall
plate and the ring wall plate is welded; Upward in this order,
until the last lap of wall plate assembly welding is completed.
Large floating roof tanks are generally constructed by forward
method, and the welding of wall plate and bottom plate is generally
automatic welding. 2.Flip-over method: The
construction procedure of flip-over method is opposite to that of
Forward-facing method. The construction procedure of flip-over
method is as follows: laying the tank bottom plate →installing the
upper wall plate on the paved tank bottom plate → manufacturing and
installing the tank top → overall lifting → installing the next
wall plate → overall lifting → installing the next wall plate from
top to bottom. Detailed Photos Product
ParametersTechnical parameters(can be designed and made according
to customer needs) Volume m ³Width (mm)Length (mm)Flange
boreManholeDiameter WTotal Can High HBarrel Long NTotal length
MHeaders Long
VabCdefg2120015001800228024050 50 50505003135016502000254027050 50 50505004150018002250285030050 50 50505005145017503000358029080 80 50505006160020003000364032080 80 50505008170021003600428034080 80 5050500101850225036004340370808080 505050012200024003600440040080 8080 50015220026003600448044080 8080 50020230027004500542046080 8080 50025255029504500552051080 8080 50030263030305100616053080 8080 50035265030506000706053080 8080 500
402850325060007140570808080 500
503020342066007090600808080 500
653220362075008790640808080 500
803460396080009380700100100100 50010036404140900010460730100100100 50012038604360960011140770100100100 50015043004800960011320860100100100 500Company
Profile Lianyungang Jiusheng Electric Power Auxiliary
Machinery Co., Ltd.a national high-tech enterprise, is located at
the foot of Jinping Mountain and beside the Qiangwei River. The
factory is located in Lianyungang City, Jiangsu Province, the
intersection of the the Belt and Road, and the east bridgehead of
the Eurasian Continental Bridge.It is adjacent to the 5A scenic
spot of Huaguo Mountain and Liu Zhizhou Sports Park.It is 5
kilometers away from the entrance and exit of the expressway, 13
kilometers away from the airport, and 36 kilometers away from the
port.It has convenient transportation by land, sea and air.
The company was founded in 2012 with a registered capital of
51 million yuan and an area of 20,000 square meters. It has 6
standardized industrial plants, supporting office areas, living
quarters and finished goods yards, with a building area of about
11,000 square meters. Our Advantages
Jiusheng Company has honed a sword for ten years, casting the soul
Related products about Jiufu Customized Containers for Industrial Storage of Gases Air Storage Tanks
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup