Disposable Nonwoven Bed Sheet Folding Machine Full Auto

NONWOVEN BED SHEET FOLDING MACHINEPackaging & Shipping Equipment IntroductionEquipment requirements: The device can process all kinds of spunlace non-woven,hot air fabric, hot-rolled fabric; acupuncture cloth, spunbond fabric, SMS, paper-plastic and other raw material.Equipment working principle: Longitudinal folding→cutting length automatically→Transverse folding→output automatically→Product stacking, the whole line complete automatically.Width of raw material under 2000mmFolded width longitudinally arbitrary adjustable, the product Cutting length can be adjusted between 350-3000mm, length error of ± 1 mm.Transverse folding: one half ,one- third, one -quarter, one -sixth, one-eighth The machine adopts the cylinder to promote the material and tension control automatically, without manual operationAll the drives use the imported servo motor, high precisionTouch screen control, only need to enter the data can change the specs, easy to operate.Electronic-control is touch screen man-machine interface operation,built-in production time,counting,a preset number of automatic shutdown, etc.Entire delivery system, strong, durable, non-polluting;Electrical wiring specifications and reasonable, elegant, easy to operate.Technical parameters:2.1 Supply Voltage: 380V 50HZ2.2 Power: 8.5KW2.3.Weight: 4000kg2.4.Speed: 0-60 m / min2.5.Dimensions: 10300 * 2400 * 2150mm2.6.machine color: silvery whiteEquipment configuration list:3.1  Servo drive: Delta (Taiwan) 5sets3.2  Gear motors: Yongkun (Taiwan) 1set3.3  PLC: Delta (Taiwan)   1set3.4  Motion Controller: Delta (Taiwan) 1 set3.5  Touch screen: Delta (Taiwan)   1set3.6  Sensor: Omron   (Japan)    3sets3.7  Inverter: Delta  (Taiwan)    1set3.8  Low-voltage electrical: delixi 3.9  Air shaft: 1set 3.10 Cylinder: airtac 1setMachine structure DescriptionThe host by the channel steel welded together, solid and firm, surface painting, The feeding part is aluminum alloy rack, the appearance is beautiful and will not get rusted permanently.Electronic control system5.1 PLC control system, touch screen man-machine interface operation, easy to operate, humanized design5.2 Through the man-machine interface to adjust speed, the size of the finished product ,and Stacking quantity.5.3With Chinese and English operator interface, easy to operateInstallation and terms of Service6.1  we provide door to door service for domestic customers, foreign customers need to install the machine by themselves. Our engineer at the request of foreign customers can door-to-door service, but users are responsible for accommodation, round tickets visa fees and so on (domestic except). And pay our engineer 100USD one day 6.2  The seller is responsible for equipment packaging costs, use FOB export situation6.3 Random with common wearing parts and special tools6.4 After leaving Shanghai port the buyer is responsible for the freight, insurance premiums and unloadingWarranty scope and manner7.1.1 Since user as the date of buy is responsible for one year warranty.7.1.2 warranty item: machine transmission and electronic control systemWarranty manner7.2.1 If some parts damaged, users can disassemble send manufacturer or repair the exchange. 7.2.2Our engineer at the request of customer can door-to-door service, but users are responsible for accommodation, round tickets visa fees and so on (domestic except). In the following circumstances, our factory is not responsible for warranty, execute collect fees repair: 7.3.1. Artificial damage, such as the machine damage cause by foreign body in fall. 7.3.2. Users without manufacturers agreed to repair itself or has been disassembled. 7.3.3. Users without changing accessories etc. 7.3.4. Customer production voltage instability caused electric damage. 7.3.5. The user handling of corruption. Considerations8.1 The machine main components should be checked regularly,Such as welding and  cutting  bearing working case,filling oil appropriately to ensure that it is working properly.8.2Periodically check the wear of the welding,Appropriate adjust the pressure,In the case of guarantee welding well, make the pressure minimum.8.3Each unwinding trays tension should be checked in order to adapt to the production needs.8.4the cutter pressure should be appropriated, otherwise easily lead to a situation such as knife fight free parts              9.1 wrench : 1 piece9.2 cutter : 2 piecesQuotes and payment10.1payment: After 30% of the total value is paid in advance by (T/T),The left 70% should be paid by (T/T) after you check up the finishedmachine. And the cargo will be delivered after all the paymentarrives at our account.10.2The quote is valid: 30 days10.3Delivery Date: Within 30 working days after receipt of prepayment from customersFolded width:under 30cmmaterial width :under2000mm   /* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1