Electric Hoist Travelling Double Beam Bridge Crane

Products DescriptionElectric Hoist Travelling Double Beam Bridge Crane To know us Gostern Rigging Co., Ltd.Is established in the year of 2001 in China.The company covers an area of 33000 square meters, more than 600 employees.It is a specialized slings company which can design, manufacture and market.Our main products are steel wire ropes, wire rope slings, synthetic fiber belt slings, nylon braided ropes, chain slings, steel plate lifting clamps, metallurgy clamps, hanging beams, rigging accessories and so on.The products are widely used in machinery, metallurgy, petroleum, chemical industrial, ports, shipbuilding and other fields.The perfect performance has been highly appraised by Users.Specification of our products                    Real work place       WILLcoil parameters(mm)opening widthdimensions(mm)DriveLimit waynotesABC8Tinnner diamater500Φ 250-1900 1000 2700 2900 three screw drive trip switch can be used under high temperature 15T20T30TRotational8Tonter diameter2200Φ photoelectric swith normal temperature coil 15T20T30TRotational   I. Overview of electric steel plate hanging beam The lifting beam (including bearing beam and connecting rigging) is a special beam lifting device for lifting objects. The lifting beam is in accordance with the general technical conditions JB/T5000.1-5000.15-1998 for heavy machinery industry standard of the People's Republic of China. The beam lifting device realizes the lifting of the suspended objects. Its lifting and installation process is simple, reasonable, flexible, convenient to use, and safe and reliable. Ii. Use method and matters needing attention of electric steel plate hanging beam 1. Move the crane to connect the crane hook with the lifting ring of the lifting beam. After lifting to an appropriate height, check whether the lifting beam is level and whether the lifting chain is tied. 2. Then move the main beam to the top of the hanging object, connect with the hanging object with the connecting rigging, and then slowly lift the crown. 3. After the balancing crane is lifted, the balance degree of the main beam should be less than 1°. Observe with naked eyes whether the bearing beam is in a balanced state. Load test lifting process is the final process of the overall preparation, the last part of the whole process of operation, should be slowly lift the load, when just off the ground, stop lifting, observe the overall force situation, and then slowly relax the load, if there is no abnormal, can normal lifting.  What we achieved we have achieved many awards both domestic and worldwide.Pls see our achievements as bellow :                          Plant view  To contact us Thank you for visiting our website, further questions please feel free to contact us. We will do our best to support you all the time.                    FAQQ1. Can I have a sample order ? A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable. Q2. What about the lead time? A: Sample needs 2-5 days, mass production time needs 1-3 weeks for order quantity more than one containerQ3. Do you have any MOQ limit ? A: Low MOQ, 1PC for sample checking is availableQ4. How do you ship the goods and how long does it take to arrive? A: Train and sea shipping both can  provide. Shipping time depends on distance. Q5. How to proceed an order ? A: Firstly let us know your requirements or application.     Secondly We offer you the ideal products and price .     Thirdly we strike the deal if everything goes well.     Fourthly We arrange the production. Q6. Is it OK to print my logo and change package? A: Yes. Please inform us formally before our production.we need comfirm with you the design.Q7: Do you offer guarantee for the products? A: Yes, we offer 3-5 years warranty to our products. Q8: How to deal with the faulty? A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.1%. We will do several inspection before we send to you.      /* March 10, 2023 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1