Product DetailsProduct NameIndustrial Water Tube Boiler Single Drum
low pressure Steam Turbine GeneratorType of outputDC/AC Three
Phase/AC Single PhaseGenerator
typeDC Generator/ Synchronous GeneratorPower100KW-2000KWA
complete set of steam turbine island comprises of following
equipments and sub-systems: 1.Turbine-generator set
---power is generated through the action of generator driven
by the turbine connected to it. 2.Water-condensation system--steam
is condensed to water to be circulated to boiler and heated again.
3.Vacuum system A.sub-system of main
steam (where steam circulates to propel the blades of turbine
) B.water cycle system (where water circulates
from condenser to be heated again ) C.DCS
system (monitors the operation of turbine and adjusts output
rate ) D. deaerating &water supplying
system (where oxygen is removed to ensure good operation
environment and water is supplied )4. Cooling Air system (for
air-cooled unit only) 5. Generator system ( electricity is
generated in this system) Our protocol of delivering power plant
construction project is as follow: 1.The Argumentation of
Project 2. Engineering Design a. Turbo-Gen Set and
its auxiliary systems b.Layout of Condensed Water
System c.Layout of Heat System d.Civil
Construction and Structure of Turbo-Gen Set 3.Equipment Purchase
a.Turbo Generator Set and its auxiliary systems
b.Condensed Water System c.Vacuum
System d.Lower Temperature Heating System 4. Civil
Construction a.Foundation and the upper structure of
the Turbo Generator House b.Foundation of Turbo-Gen
Set and its auxiliary systems c.Foundation of other
structures 5. Operation & Maintenance a.Operation of
power plant (technical counseling) b.Regular
maintenance and inspection c.Technical Training
Program for power plant personnel d.General Overhaul
6. Installation & Testing a.Installation & testing
for all systems & equipment provided b.Installation,
testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power
plant (Optional) 7. Supply of Spare Parts Reference
List No.ItemProject detail01CommissionerLafargeHolcimCentury
Paper MillPolatSPGCL02LocationGombe State, NigeriaLahore,
PakistanTurkeyIndia03Scope of serviceEPC projectEngineering,
Purchase, Supervision of constructionEPC projectEPC
project04Applicationservice power plantof a cement factoryservice
power station of a paper millindependent power plantindependent
power plant05Modelair-cooled condensing turbine
islandcondensing/extracting turbinecondensing turbinereheat
turbine06BrandSimonsHTPHTPHTC07Standard of
engineeringDIN.GBGBGB08Layoutsingle-story layout with horizontal
steam dischargedownward steam dischargedownward steam
dischargedownward steam discharge09Technical parameterspresure of
steam inlet:8.5MPtem. of steam inlet: 435C.rated power:16.5MWback
pressure:15KPapresure of steam inlet:4.9MPtem. of steam inlet:
475C.rated power:18MWpressure of extraction:1.1MPflow of extracted
steam:54.6Mpaback pressure:15KPapresure of steam inlet:8.83MPtem.
of steam inlet: 435C.rated power:51MWback pressure:4.9KPapresure of
steam inlet:16.7MPtem. of steam inlet: 538C.rated
power:300MWpressure of extraction:1.1MPback
pressure:10KPa10Performance (under standard condition)heat
rate:2467kcal/kwsteam rate:4.16kg/kwheat rate:2206.5kcal/kwheat
rate:2215.3kcal/kwsteam rate:4.16kg/kwsteam rate:3.64kg/kwWe
produce high quality DC motor1. Model-YRKK560-82.
AC Slipping3. 415V4. 900KW5.
750-RPM6. 50Hz7. Cooling
IC6118. Protection:IP54 (Total Enclosed)9.
Mounting:IMB310. Frame:560MM11. Duty:SI12.
SKF Bearingdust removal equipment water bath dedusting
equipmentFeatures of electric furnace dust removal system:1) Dust
removal system equipment has strong reliability, not affecting the
normal operation of smelting, easy for maintenance. 2) Gas flue
capture mode belongs to the whole process of capturing. 3) Gas flue
capture rate is more than 98 percent, can achieve plant roof, can
not see smoke 4) Dust collection efficiency is more than 99 percent
5) Dust concentration in the workshop is less than 10mg/m3. 6) Low
cost for long-term operating , stable efficiency 7) The wind engine
noise is less than 80dB. 8) The flue has no dust fouling phenomenon
9) Dust collecting volume is more than 12Kg / t steel Induction
furnace is used for smelting or insulating ferrous metals,
non-ferrous metals, sponge iron, such as scrap iron, scrap steel,
copper, aluminum and so on. Complete working equipment such as
continuous casting machine, rolling mill, mainly used for the
production of billet, steel bar, angle steel, H-beam, I-beam, etc.
Using KGPS, IGBT, single or double power supply technology, PLC
(Siemens) can be realized throughout the monitoring.
Main supply list: 2 sets of electric furnace
body, 2 sets of hydraulic or mechanical tilting electric furnace
mechanism, 1 set of control pl
Related products about Industrial Water Tube Boiler Single Drum Low Pressure Steam Turbine Generator
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup