Fluidized Circulating Bed boiler (as known as FCB boiler) refers to
a type of boiler in which polverized fuel is burnt while being
blown to circulate in fluidizing motion. FCB boiler is now the most
recognizable boiler type, especially in the area of power
generation. It is mostly used for burning biomass, kerogen shale
and other fuel hard to combust.FCB boiler has following features
:1. High burning rate: FCB boiler unit, among all the boilers, has
the highest buring efficiency (98% to 99%) due to the circulation
of fuel propelled by air blown to the furnace.2. Wide range of
choice on fuel: FCB boiler was designed to burning most of fuel
that are hard to burn otherwise, such as MSW (Municipal Solid
Waste), coal gangue,kerogen shale and animal dung. Wide application
of FCB has made power generation available to people in less
developed area.3. Highly developed technology: the application of
FCB boiler is one of the most developed area of Chinese power
generation generation sector. Technical difficulties such as
expansion, overheating, erosion, wearing-out have been overcome
over the year, which makes the operation safer than ever.4. Low
maintenance cost & long service: Silicon nitride lining
extends the service life to over 20 years and also makes regular
maintenance less frequent, compared to other boilers.5. Easy
mounting of heat recovery system: heat recovery system can be
mounted to boiler for collecting energy from the exhaust. Combined
with Low-temperature steam turbine provided by Runh Power, the FCB
boiler is able to generate additional power, for either service
power consumption or transmitting to grid.Runh Power positions
itself no only as a supplier of power plant equipment but also an
independent contractor of EPC service (engineering, purchase &
construction) delivering power station project. With at least
PPA and Feasibility Report in place, Runh Power is able to help the
commissioner to secure private investment or loan from the state
bank. -1) Power Purchase Agreement (For independent
power producers only) -2) Feasibility report(In case that
there is none, designers and engineers can be dispatched to compile
one at the expense of commissioner.)-3) Sovereign bonds
(If sovereign bonds are acquired and the commissioner has 15 %
of capital need for the project, Runh Power could start the
project while engaging China Export & Credit Insurance
Corporation)-4) Construction Permit (optional)-5) Fire
permit (optional)-6) Environmental impact
assessment (optional)-7) Land Lease (optional)-8) Power
Generation Power (optional)-9) Other documents deemed
helpful (optional) Runh Power's rule as a contractor of
power plant on EPC basis:Runh Power is dedicated to provide various
kinds of power plant construction on EPC basis, including :A.
conventional power plant (coal-firing, gas-firing, municipal solid
waste firing)B. renewable energy power plant (photovoltaic,
photothermal, biomass-firing, hydro power plant)The scope of work
is as follows: 1.The Argumentation of Project a.
Verification of documents submitted b. Audition of
documents by the authority c. Signing the
contract2. Engineering Design a. Selection of a
complete set of equipment according to the request or Runh Power's
recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant. c. Selection of
personnel participating in the project d. Submission
of technical solution to the commissioner for review and
approval.3.Equipment Purchase& Transportation a.Turbo
Generator Set and its auxiliary systems (boiler, condensing water
collector, deaerator, high pressure and low pressure superheaters,
power distribution system. etc ) b. All the
construction material, tools, spare parts and other necessities of
the project4. Civil Construction a. All the civil
construction work within the parameter of power plant5. Operation &
Maintenance a. Operation of power plant (technical
counseling) (Optional) b.Regular maintenance and
inspection (Optional) c.Technical Training
Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)6. Installation & Testing
a.Installation & testing for all systems & equipment
provided by Runh Power b.Installation, testing & trail
run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant
(Optional)7. Supply of Spare Parts a. Long-term supply
of spare parts and other consumibles.(Optional)Notice: EPS service,
which refers to Engineering, Purchase & Supervision of
Construction,is also available at your request, in case you prefer
local civil construction contractor to international contractor.For
viewing complete scope of Runh Power's service and more models of
boilers, please copy and paste following link to your
browser. Runh Power's service catalog :
http://runhpower.en.made-in-china.com /* March 10, 2023
17:59:20 */!function(){function
Related products about Corn Husk, Stalk and Straw, Biomass Firing Thermal Power Plant
- Waste Tyre Plastic Recycling Machinery Machine Tire Crusher Production Line Rubber Crumb Grinding Machine Equipment Tire Shredder
- Stretch Plastic Blowing Pet Bottle Making Blow Molding Machine Bottles Stretch Automatic Pet Bottle Blowing Machine
- Waste Plastic Pet Bottle, Water Bottle Flake, PP/HDPE/LDPE PE Film Jumbo Woven Bags Plastic Crusher Machine, Plastic Crushing Washing Recycling Machine
- Type 2 Wall-Mounted Electric Car Charging Station 7kw /11 Kwelectric Vehicle Charging Station Home Wallbox AC EV Charger Single Phase or 3three Phase
- G-View G12W Wholesale Auto Car LED Headlight Bulb High Power H13 H11 9005 H7 H4 Car LED Headlights LED Car Lights
- New Design Porcelain Round Plates Dinner Set for Wedding and Banquet
- China 2023 New Design Super Soft 100% Polyester Microfiber Knitted Oversized Decoration Hoodie Blanket
- Handmade Art Creative Materials Thickened White Paper Cup DIY Disposable Handmade Colored Paper Cup