Hrw 12kv 35kv 100A 200A Outdoor High Voltage Protection AC Drop-out Fuse Solid Fuse

Product DescriptionDrop-out fuse cutout and load switching fuse cutouts are outdoor high voltage protection devices. They are connected with the incoming feeder of the distribution transformer or distribution lines. These are primarily used to protect transformers or lines from short circuits and overloads and switching currents. The drop-out fuse unit is composed of insulator supports and a fuse tube, static contacts are fixed on two sides of the insulator support and moving contact is installed on two ends of fuse tube. The interior of the fuse tube is the extinguishing tube. the exterior is made of the phenolic compound paper tube or epoxy glass. Load switching cutout fuse provides stretch auxiliary contacts and arc-extinguish closure for switching on/off loading current.In normal operation, the fuse link is tightened to form tho closed position. In the fault current situation, the fuse link melts and an electrical arc is formed. The arc-extinguishing tube is as occurs. This causes high pressure inside the tube and causes the tube to separate from the contacts. The strength of the contact is relaxed once the fuse elements melt. The cutouts now in the open position, the operator needs to switch the current off. Then with an insulated operating bar, the moving contact can be pulled off. The main contact and auxiliary contact is connected.Model DescriptionProduct technical parameters and installlation effectBracket installation diagram: Product installation effect:Product features and scope of useMelt tube structure:Fuse take made of flberglsaa, damp-proof & corrosion-proof.Fuse base:Product base embedded mechanical structure and insulator. Install metal rod mechanism using special binder materials and insulator together , can with stand short-circuit current open the electric power.Moistureproof fuse has not blister, deformation, open ,large capacity, UV,long life, superior electric properties, dielectric strength and excellent mechanical stiffness and consecrated ability.The whole organization to neutral, convenient installation, safe and reliable.1. The ambient temperature is not higher than +40 C, not lower than-40 C2. The altitude does not exceed 3000m3.The maximum wind speed does not exceed 35m/s4. The earthquake intensity does not exceed 8 degreesFuse Installation and Operation1. Installation of drop fuse:(1) The melt should be tightened during installation (so that the melt is subjected to a tensile force of about 24.5N), otherwise it is easy to cause the contact to overheat.(2) The fuse installed on the cross arm (frame) should be firm and reliable, and there should be no shaking or shaking.(3) The melting tube should have a downward inclination angle of 25°±2°, so that the melting tube can quickly fall by its own weight when the melt is blown.(4) The fuse should be installed on the cross arm (frame) with a vertical distance of not less than 4m from the ground. If it is installed above the distribution transformer, it should maintain a horizontal distance of more than 0.5m from the outer contour boundary of the distribution transformer. A fall of a melting tube caused other accidents.(5) The length of the fuse tube should be adjusted moderately. It is required that the duckbill tongue can hold more than two-thirds of the length of the contact after closing, so as to avoid the misoperation of self-falling during operation, and the fuse tube should not hit the duckbill. , in order to prevent the melting tube from falling in time after the melt is blown.(6) The melt used must be a standard product of a regular manufacturer, and has a certain mechanical strength. Generally, the melt is required to withstand a tensile force of more than 147N.(7) The 10kV drop-out fuse is installed outdoors, and the distance between phases is required to be greater than 70cm.Second, the operation of the drop fuse:Under normal circumstances, it is not allowed to operate the drop fuse with load, only it is allowed to operate the no-load equipment (line). However, branch lines of 10kV distribution lines in rural power grids and distribution transformers with rated capacity less than 200kVA are allowed to operate with load according to the following requirements:(1) The operation shall be carried out by two persons (one to monitor and one to operate), but must wear qualified insulating gloves, insulating boots, and goggles, and operate with qualified insulating rods with matching voltage levels. Operation is prohibited in heavy rain.(2) During the operation of the gate, it is generally stipulated that the middle phase is pulled first, then the leeward side phase is pulled, and then the windward side phase is pulled. This is because the distribution transformer is changed from three-phase operation to two-phase operation, and the arc spark generated when the intermediate phase is broken is small, which will not cause a short circuit between phases. The second is to break the leeward side phase, because the middle phase has be