Ceeg High Temperature Srbht35 Oil-Immersed Transformer Resistance Amorphous Alloy Power Voltage Transformer

Product Description FEATURES . High quality and high permeability silicon steel with a multi-stage stepping process leads to low no-load loss.2. The surface adopting nano paint self-leveling process leads to low noise.3. Strong waterproof and short-circuit resistance, strong overload capacity, good electrical performance, safety, and reliability.4. Through the simulation analysis of the electric field, temperature field, and magnetic field, CEEG is the first company in China to pass KEMA's E2, C2, and F1 tests.5. The product can adopt a dual-mode structure scheme to meet the needs of different customer groups.6. Special intelligent transformer solutions and big data cloud diagnosis technology are adopted to be online from time to time.  Product Parameters Performance parameters of SZ22-6300~63000/66kV oil-immersed three-phase double-winding on-load voltage regulating power transformer (first-class energy efficiency)Rated CapacitykVAVoltage combination and tap rangeVector GroupLoad loss kWload loss kW(75C)No-load current%Short circuit impedance%Transport PackageHS CodeHigh voltagekVMedium voltage KVLow voltage kV630063 6669±5%±2x2.5%6.3 6.8 10.5YNd114.40 30.8 0.60 9.0 International Wooden Case or According to Client′s requirements850434900080005.30 36.5 0.60  100006.20 43.0 0.56  125007.40 51.1 0.56  160008.90 62.8 0.52  2000010.60 76.1 0.52  2500012.50 90.0 0.48  3150014.80 108.0 0.44  4000017.70 126.9 0.44  5000020.90 150.3 0.40  6300024.70 178.2 0.36    Certifications  CERTIFICATED & QUALIFIED SCB series cast resin dry-type transformers have reached the first-level energy efficiency standard of GB20052-2020, and won the 3C, PCCC energy-saving certification, ISO-9001, ISO-45001, and ISO-14001 certificates.CEEG's cast resin dry-type power transformers have been widely adopted in key projects by customers from all over the world. For example, they have been chosen to serve in the Qingdao International Sailing Center, Beijing Urban sub-Center, Beijing Stadium the Skating Hall, Nanjing Metro, Shanghai EXPO Exhibition Center, etc. DESIGN & MANUFACTURE PROCESS Based on more than 30 years of design, manufacturing, and experimental experience in the transformer industry, CEEG has developed a set of advanced three-dimensional + parametric design software, which can realize automatic design, cost optimization, and simulation.Fully considering the requirements of the national and industrial standards, ensuring the advantageous design of products.The high-voltage winding conductor is wound with a high-quality conductor and reinforced with long and short-cut glass fiber felt. Poured by the advanced Heidrich vacuum pouring system under vacuum. Effectively restrain the occurrence of partial discharge, and the partial discharge is ≤ 5pc.The low-voltage winding adopts a high-quality foil conductor and is wound on an automatic foil winding machine. The foil winding machine adopts the patented technology of foil wire hydraulic energy-saving tension crimping device, high-precision detection of ±0.5mm, and advanced argon arc welding technology, which plays a key role in ensuring the quality of coil winding.The iron core adopts a high-quality high magnetic conductivity-oriented silicon steel sheet, a 45° full oblique step lapping process, and the surface adopts special moisture-proof and rust-proof coating, which effectively reduces the no-load current and noise level.  Packaging & Shipping USE &PACKING  SERVICE CONDITIONS - The installation site shall not be flooded by water, the altitude shall not exceed 1000m, and the ambient temperature shall not be higher than 40ºC. The relative humidity is 100%, and the environment is 40ºC to -25ºC (-25ºC requires an on-load tap changer and temperature controller).PACKAGING & TRANSPORTATION - The products can be partially disassembled and transported (such as on-load tap changer, temperature controller, air cooling device, enclosure, etc. can be packaged separately) or packed as one piece in packaging boxes for transportation.VISUAL INSPECTION BEFORE INSTALLATION - After opening the package, remove the protective device and check the external conditions, especially paying attention to the mechanical integrity of the coil and iron core, and the bolt fastening at the connection.INSPECTION BEFORE OPERATION - Measure the DC resistance of high voltage and low voltage windings. Then check the grounding of the iron core to see whether the grounding is reliable and whether foreign matters are overlapping. Last to test the insulation resistance.ENERGIZING - Before putting into operation, the transformer shall be put into trial operation under no-load, and the protection system shall be checked and adjusted after 3 times of impulse closing. ABOUT CEEG INDUSTRIAL ZONES  4 FACTORIES 15 OVERSEAS BRANCHES 80+ GLOBAL MARKETS THIS IS OUR DEVELOPMENT -   Headquartered in Nanjing, CEEG has always been adhering to the core values of "foresight, innovation, and responsibility" since its establis