Attiny24A-Ssu Integrated Circuits (ICs) Embeddedmicrocontrollers Soic-14

ATTINY24A-SSU Integrated Circuits (ICs)EmbeddedMicrocontrollers SOIC-14   Product Status Active   Core Processor AVR   Core Size 8-Bit   Speed 20MHz   Connectivity USI   Peripherals Brown-out Detect/Reset, POR, PWM, Temp Sensor, WDT   Number of I/O 12   Program Memory Size 2KB (1K x 16)   Program Memory Type FLASH   EEPROM Size 128 x 8   RAM Size 128 x 8   Voltage - Supply (Vcc/Vdd) 1.8V ~ 5.5V   Data Converters A/D 8x10b   Oscillator Type Internal   Operating Temperature -40°C ~ 85°C (TA)   Mounting Type Surface Mount   Package / Case 14-SOIC (0.154", 3.90mm Width)   Supplier Device Package 14-SOIC   Base Product Number ATTINY24               Q1:What service do you have?We provide turnkey solution including RD, PCB fabrication, SMT, testing and other value-added service. Q2:What are the main products of your PCB/PCBA services?Our PCB / PCBA services are mainly for the industries including Medical, Automotive, Energy, Metering / Measurements, Consumer Electronics. Q3:Can we inspect quality during production?Yes, we are open and transparent on each production process with nothing to hide. We welcome customer inspect our production process and check in house. Q4:How can we ensure our information should not let third party to see our design?We are willing to sign NDA effect by customer side local law and promising to keep customers data in high confidential level. Q5:What files required to get quotation from you?For PCB quotation, please provide the Gerber data / files and indication of related technical requirements as well as any special requirement if you have.For PCBA quotation, please provide Gerber data / files and also BOM (bill of materials), and if you need us to do function test, please also provide the test instruction/procedure. Q6:What is standard delivery term?Delivery terms of EXW, FCA, FOB, DDU etc. are all available based on each quote. Q7:How long does it take for PCB quote?Normally 12 hours to 48 hours as soon as receive internal engineer evaluate confirmation. Q8:Do you have any minimum order quantity (MOQ) requirement?No, we do not have MOQ requirement, we can support your projects starting from prototypes to mass productions.     /* January 22, 2024 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(",").forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1