24"X 8′ Symons Steel-Ply Forming System for Concrete Construction

 24"x 8' Symons Steel-Ply Forming System for Concrete Construction Steel-Ply is the most widely accepted, pre-engineered, modular formwork system in usetoday. It can be reused 200 times after timely replacement of plywood, and is compatiblewith all other industry standard formwork forming systems.It is designed for maximum versatilityand can be used to form virtually any concrete structure.Steel-Ply specialty forms are used forBulkhead Forming, Haunch Forming, Pilaster, Adjustable Pilaster Forms, and Culvert Forms.Steel Ply Forming SystemProductPictureSpecification  MaterialSymonsFormwork8"x8'10"x8'12"x8'14"x8'16"x8'18"x8'20"x8'22"x8'24"x8'8"x6'10"x6'12"x6'14"x6'16"x6'18"x6'20"x6'22"x6'24"x6'8"x4'10"x4'12"x4'14"x4'16"x4'18"x4'20"x4'22"x4'24"x4'45# SteelOther Size AvailableSteel Ply Forming System Accessories ProductPictureSpecificationMaterial FeatureX Flat TieWall Tickness 6"-48"Other Sizes SupportSteel #45 Ultimate Load6000lbsWedge BoltShort Wedge BoltSteel  #45Heat TreatmentStandard Wedge BoltLong Wedge BoltADJ Wedge BoltPly Spacer3/4", 1-1/8" 6-12"Carbon Steel High Quality Shore Clamp4*4, PaintedCarbon SteelHigh QualityOne Piece Waler Clamp837g, GalvanizedCarbon SteelHigh QualityZ Tie Holder325g, Red PaintedCarbon Steel High QualityTurnbuckle Aligner1.Standard Type/Heavy Duty Type2. Bend Head/Flat Head Carbon Steel  Steel Angel/Four Steel  Bar Other Formwork System Formwork Tie Rod System Aluminum Formwork System Snap Tie System  Advantages:• Designed to form both straight and radius walls• No special tools required - just a hammer• System may be handset or assembled into gangs• Most popular concrete forming system in the AmericaThe steel-ply formwork is a pre-engineered, factory-built, reusable concrete forming system. Itmay be used in handset or gang form applications, for commercial or residential structures.The Steel-Ply forming system can form walls of almost any shape or size, with accessories forspecial structures and details. This symons seel ply forms system is more productive andeconomical than job-built plywood formwork or other forming methods. Steel-Ply Saves Time The Steel-Ply forming system saves time because it is easy to set up andstrip. No measuring, sawing, drilling, or nailing is required. Minimal training is needed, so workersare quickly up to maximum efficiency. The only tool required for setup and stripping is a hammer.The steel ply forms is equally ideal for commercial or residential structures. It uses standard sizesthat can be combined to form almost any dimension. With more than 80 panel and filler sizes,this system offers maximum versatility no matter how they are combined. They can be handsetor gang-formed horizontally or vertically. They can also be used for curved walls. This flexibilityenables contractors to conserve materials and benefit from savings.Related products Hollow Plastic Formwork, which is made of PP, is designed to replace the traditionalPlywood. The advantages are:1. REUSE 80-100 time, no oil needed2. 100% Waterproof3. Can easily cut, nail and screw4. Save at least 30% total cost X Flat Tie SystemX-Flat Ties are used with Wedge Bolts to space and secure modular concrete forms.Company ProfileTRICO was founded in 2002. As an expert in the field of formwork and scaffolding, TRICOis committed to providing better products and services to customers in the global constructionindustry.TRICO has a wide range of product lines, including the production and supply of fullsystem of building formwork, scaffolding and related components, and has realized the "1+N"one-stop service mode. The products sell well in more than 90 countries and regions, winningthe recognition and trust of business partners around the world.TRICO's R&D team is experimenting and optimizing products every day. The endlessimprovement and perfection is the gene of TRICO culture. TRICO's mission is to promote thequality improvement, cost reduction and environmental protection and efficiency enhancementof global buildings.Let's work together to make it easier to build houses anywhere in the world!Our services TRICO Supplying Now:· Formwork Tie Rod System· Aluminium Formwork Wall Tie System· Scaffolding System· PP Hollow Plastic Formwork· Steel Formwork Panel with Plywood Forming System1. Quality: Strictly control the quality through three levels. First level, quality test on the producing line. Second level, quality test during warehousing. Third level, quality test before loading.2. Timeliness: 24 hours online.Provide consulting and quotation services for customers all thetime.3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meetcustomer's requirement.4. Integrity: If The customer complains about the quality of the products, our company willactively cooperate with them to solve the problem. If it is the responsibility of our company, wewill bear  the corresponding responsibility and compensation.5. Longevity: Establish good long-term relationship with customers./* Ja