Stainless Steel Pipe Hydraulic  Fitting  Bulkhead Fitfittings with HDPE Pipe

HDPE water supply pipe use PE110 or PE80  as raw materials, processing good flexibility, corrosion resistance, excellent impact resistance and other characteristics, pipe and fittings can be employed melt socket connection,  Butt and fused connection,to insure the pipe system safety and reliability as well as low construction cost.--HDPE pipes  Introduction--1) Material:PE100/PE80                                   2) Standard:GB/T9001-20003) Certification:ISO9001:2008                          4) Package:Nuded packing 5) Connection:Butt fusion,socket joint ,electric connect6) Color:black with blue stripe or customized 7) Pressure  rating:1.6Mpa,1.25Mpa,1.0Mpa,0.8Mpa,0.6Mpa --Product Feature--1) Non-toxic,No Leakage.                  5) Hygienic Safety2) Smooth Surface                              6) Corrosion resistant.3) Excellent Flexibility                         7) Recycle and environment-friendly4) Easy Installation and Lower costs--Product Specification-- External DiameterDn(mm)HDPE PIPE(SDR13.6)Thickness(mm)Weight(KG/M)503.70.558634.70.895755.61.265906.71.821108.12.691259.23.4314010.34.2216011.85.6720014.78.8122516.611.1525018.414.0728020.616.831523.222.38--Applications--1) Municipal water supply, gas supply and agriculture etc.2) Commercial & Residential water supply3) Industrial liquids transportation4) Sewage treatment5) Food and chemical industry7) Replacement of cement pipes and steel pipes8) Argillaceous silt, mud transportation9) Garden green pipe networks --Product Installation--Mainly connection ways1)  Dn≤110mm,Use hot melt socket connection or fused connection     Dn≥110mm,Use butt fusion connection or fused connention2)  Connection with metal pipe and metal fittings ,can connected by flange connection --Product Photos----Sales Service--Packaging :roll plastic bag for pipe ,put fittings into nylon bags then out of cartonShipping:For samples order ,we support transfer by international express,such as FEDEX,DHL,TNT or EMS;For final order,we do sea shipping ,our factory are near from shanghai port and ningbo port ,we can transfer goods to port within 6 hours Delivery : Within 7-45ays after receiving depositWe promise our customers the Best-Quality products with reasonable price.