Wld15000 Big Bus Paint Booth Spray Booth Painting Booth/Room/Cabin/Oven Paint Oven Automomtive Repair Painting Cabin Workshop Equipment CE

2023 CE approved WLD15000 industrial big bus/truck spray booth paint booth manufacturer produce   Product DescriptionProduct Description:12m, 15m, 18m, 20m, 22m...any sizes can be customized; 3D lift in the big spray booth is optional. Air exhaust from two sides of spray room or pit is optional; Drive through type door, rolling door and folding door are optional. Air generation system on the top of spray room is optional.   ModelWLD15000External Size:(mm)15150×8850×5600Front Door:(mm)4000(W)×4800(H) Aluminum FrameInternal Size:(mm)15000×5000×4800Total Power:47KWAir flow(m3/h)24000 x3  Air Speed (m/s)0.3-0.5Vehicle SuitedBus&Truck Cabin SystemWallboardSandwich style EPS (epispastics polystyrene) 75mm thickness. Colorful steel skin boards 0.476mm thickness. Galvanized steel roof panel.  Door 4 pcs of front doors with special rigid frame. Size: 4000(w) x 4800(h). 2 pc of emergency door.   Air Circulation SystemIntake Fan ((3sets)Each set consists of 2x4kw intake fan. Total 6 units of 4kw intake fan. BELIMO 20N electric damper.  Exhaust Fan(3set) Each set consists of 1x5.5kw exhaust fan. Total 3 units of 5.5kw exhaust fan. Multi-layer fiberglass filter. Exhaust air from basement or two sides of wallboard.  Air PipeMade of Galvanized steel sheet consisted of 4 pieces of straight pipe750×750×1000, and 1piece of elbow. Air intake cabinet and air ducting for option.  FilteringMultilayer filtering structure. The primary filter can capture granules larger than10μm. Ceiling filter capture granules bigger than 5μm. The green filter on the basement plenum and exhaust fan can filter the paint and dust emission. The air cleanliness in the working environment can reach 98%.  Heating SystemBurner(3set): Each set consists of 1 unit Italy Riello G20 diesel burner 200000Kcal/h. Total 3units of burners,600000Kcal/h.  Heat ExchangerThe heat exchanger is made of 1.5mm thickness stainless steel which features more heat dissipating surface, better heat exchange and better burner efficiency.    LED Lighting SystemLight tubeCeiling light has 18units x 4pcs of 36w lamps. Side light has 22 units x 2pcs of 36 w lamps. Total 116 pcs of 36 W lamps.    Filtering SystemPre-filterGrade G2 plate type fiber glass filter; Dual filtering structure. The pre-filter can capture granules larger than 10μm.  Ceiling filterEU5 grade high efficient filter; Ceiling filter capture granules bigger than 5μm.The air cleanliness in the working environment can reach 98%.   Ceiling filter supportMade of tube steel frame, thickness of 1.2mm, epoxy powder coating, antirust and strong, rigid, beautiful and durable, can be repeated disassembly, not easy to damage, easy to replace filter cotton.  Pollution Control SystemMulti-layer fiberglass filter, including basement Plenum (side exhaust) and Exhaust fan filter. The air cleanliness in the working environment can reach 98%.  Control systemControl panel Microcomputer control system. Cabinet type, standard control system, easy to control and maintain.   FunctionPainting, constant temperature painting , drying, lighting, painting time and drying time setting ;emergency stop switch, failure indication, over-temperature alarm indication, especially with over-temperature and over-pressure alarm device. The electricity will be cut off once alarm devices alert. It makes our booth very safe.  Drawing of this paint booth    Real CaseReal Case      Company ProfileAbout us:  Guangzhou Weilongda Electromechanical Equipment Co.,Ltd., Established in 2000,located in Huadu District Guangzhou,(where is only 20 min by car from Baiyun international Airport) is one of the earliest and largest automobile care and maintenance equipments manufacturers and suppliers in china.The factory covers an area of 18000 sq,m,Specialized in manufacturing spray booths,preparation stations,car lifts,body repair systems,tire changer,wheel balancer,wheel aligners and other relevant garage equipment to the clients all the world.Product ShowroomMeeting RoomFAQFAQQ1:Are you Manufacturer or Trading Company?A:We are a professional manufacturer with our own export department. Our factory was established in 2000.Q2:Where is your factory located? How can I visit there? A:Our company is located in Guangzhou City, China.All clients, from home and abroad,are warmly welcomed to visit us.Q3. What is your terms of packing?A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.Q4. What is your terms of payment?A: By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.Q5. What is your terms of delivery?A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU. Q6. How about your delivery time?A: Generally, it will take 10 to 15 days after receiving full payment. If your voltage is different from 380V/3PH/50Hz, the delivery time will be around 20 days for custom-made motors or electric components. Q7.Ca